본문 바로가기

Intellectual Property Rights

  • Category or title

    Date of Filing

    Application No.

    Registration No.

    Registration Date

  • [Infrastructure]

    System and method for remediating contaminated soil by separation of contaminant-concentrated coarse soil

    10 Nov 2011
    10-2011-0116871
    10-1167478
    13 Jul 2012
  • [Infrastructure]

    System and method for remediating contaminated soil of highly contaminant-concentrated fine soil using multiple micro hydrocyclone

    10 Nov 2011
    10-2011-0116870
    10-1167479
    13 Jul 2012
  • [Building & Housing]

    Method of construction planning of supertall buildings

    17 Dec 2010
    10-2010-0129558
    10-1162458
    27 Jun 2012
  • [Infrastructure]

    A compressed and dispersed composite anchor removable the tension member and constructing method the same

    10 Sep 2009
    10-2009-0085561
    10-1158417
    14 Jun 2012
  • [Infrastructure]

    LABYRINTH WEIR HAVING PREVENTING ACCUMULATION STRUCTURE

    9 Nov 2011
    10-2011-0116229
    10-1155687
    5 Jun 2012
  • [Infrastructure]

    RIVERBED STRUCTURE HAVING ACCELERATING FLOW PATH FOR PREVENTING ACCUMULATION

    9 Nov 2011
    10-2011-0116223
    10-1155744
    5 Jun 2012
  • [Common]

    Reduction Device of Concrete Temperature Gap, Reduction Method using the Device and Structure using the Method

    27 Nov 2009
    10-2009-0115487
    10-1155285
    4 Jun 2012
  • [Infrastructure]

    CONCRETE GIRDER

    1 Dec 2011
    10-2011-0127599
    10-1149314
    17 May 2012
  • [Infrastructure]

    Construction Method of Multi-span Simple Support Bridge

    22 Dec 2011
    10-2011-0140019
    10-1148551
    11 May 2012
  • [Infrastructure]

    Configuration Control Method of Strand Erection in Suspension Bridge using Sag Sensitivity Based on Numerical Analysis

    18 Nov 2011
    10-2011-0121074
    10-1145026
    3 May 2012