본문 바로가기

Intellectual Property Rights

  • Category or title

    Date of Filing

    Application No.

    Registration No.

    Registration Date

  • [Infrastructure]

    A Displacement Bored Pile Method with Impermeable and Detachable Casing Shoe

    3 Sep 2014
    10-2014-0116934
    10-1702180
    25 Jan 2017
  • [Infrastructure]

    Appartus for decreasing girder deformation of long-span bridge and its construction method

    24 Dec 2014
    10-2014-0188200
    10-1697830
    12 Jan 2017
  • [Infrastructure]

    Underwater construction method of concrete-piling retaining-wall structure using automatic stripping formwork

    25 Aug 2015
    10-2015-0119609
    10-1697017
    10 Jan 2017
  • [Infrastructure]

    Precast wall using soil interception pile, underground structure having Precast wall and Method for connecting precast wall

    22 Apr 2015
    10-2015-0056391
    10-1696282
    9 Jan 2017
  • [Infrastructure]

    Underwater concrete wall using precast wall panel and method of constructing the same

    11 Sep 2015
    10-2015-0129079
    10-1696552
    9 Jan 2017
  • [Infrastructure]

    STRUCTURE FOR PREVENTING SEDIMENTATION OF SOIL BY INCREASING SCOURING EFFECT

    30 May 2014
    10-2014-0066234
    10-1687871
    13 Dec 2016
  • [Building & Housing]

    Evaluation and adjustment method of lateral displacement considering torsional deformation of building

    27 Oct 2015
    10-2015-0149659
    10-1686621
    8 Dec 2016
  • [Infrastructure]

    reclamation soils by mixing coarse-grained soils and fine-grained soil, producing method thereof and reclaiming method thereof

    22 Sep 2015
    10-2015-0133826
    10-1685302
    5 Dec 2016
  • [Building & Housing]

    Seismic isolation device

    1 Jun 2015
    10-2015-0077113
    10-1684575
    2 Dec 2016
  • [Building & Housing]

    Cooling and heating system using solar heat and controlling method of the same

    21 Aug 2015
    10-2015-0117793
    10-1684669
    2 Dec 2016